Recent Projects

TOP Engineering leads the field of multi-disciplinary engineering, implementing projects in Israel and overseas. The company has carried out a large number of projects professionally, dependably, and with dedication in more than 30 years of operation, consistently meeting timetables and budgets.

The Fifth Water Supply System for Jerusalem
Client: MEKOROT Israel National Water Co.
B.A.B. ENGINEERING DESIGN & DEVELOPMENT L.T.D and its professional staff are currently assisting in the management of the mega-project for the construction of water supply systems for the Israeli capital city of Jerusalem and the neighboring settlements. This is one of the biggest and more complex projects being executed at country level. The project includes the erection of water systems up to 80 inch diameter, water pools, pumping stations, infrastructure and more.
Project Value: Hundreds of millions Nis
Erection of a commercial building in Kyriat Shmona
Client: RAMI LEVY Shikma Marketing
Management and supervision of a project for the erection of a commercial center, including: electrical systems, air conditioning, fire extinguisher systems, sealing, flooring, coating and roofing of the site, bills checking, occupancy and certificate of occupancy approval.
Project Value: NIS 22,000,000
Pazcar- Industrial Area Alon-Tabor
Client: PAZ CAR
Multidisciplinary design of devices and systems for the production of ointments including process and mechanical design, pipelines, civil engineering, electricity, instrumentation and control, and paperwork for the preparation of a contractors tender and publication.
Project Value: aprox. 10,000,000 Nis
Construction of a PRMS station at the Alon Tabor Industrial Area for Tnuba Industry and a Siemens Power Station
Client: Israel Natural Gas Lines
Management and supervision of field development works, construction, pipelines landing, mechanical and electro-mechanical works, safety supervision, authority certificates and permits.
Project Value: NIS 22,000,000
Expansion of a production plant of water and gas supply systems for infrastructure –(Management. Design, Purchasing, &Supervision)
Client: PLASSON Israel LTD
Management, design and supervision of the construction of a materials warehouse and chicken coop wing in a general area of approx. 8 dunams. The works included: construction, infrastructure, roads and access ways, water & sewage systems, electricity & communications, other service systems, parking lots, construction permits, budget estimations, timetables, quantities lists, tenders preparation and more.
Project Value: NIS 52,000,000
Construction of a new industrial plant for the production of pool cleaning robots -–(Management. Design, Purchasing, &Supervision)
Client: AQUABOT LTD
Management, design and supervision of the erection of a new plant in the Alon Tabor Industrial Area , Upper Afula region (management, design, purchase &supervision). Management of construction permits, design of field development operations, inner roads, construction works: production structure, offices, warehouses, dinning room and other services. Design of electricity systems, high and low voltage, air conditioning, fire extinguishing systems, ventilation and fire evacuation, plumbing, water and sewage systems, compressed air, as well as budget and timetables planning of the project.
Project Value: NIS 25,000,000
Construction of a public city park “Eucalyptus park” in Bet Shaan
Client: Jewish National Fund -Keren Kayemet LeIsrael
Management design and supervision of the erection of a public city park in Bet Shaan, spreading throughout an area of approx. 100 dunams including playground areas, water shows, administration buildings, secure spaces, services systems, water and sewage systems, underground pumps room, paving works including trails, electricity infrastructure, lighting and peripheral fencing.
Project Value: NIS 15,000,000
Management and supervision of the upgrading and accessibility improvement in railway stations
Client: Israel Railways
Management and supervision of the upgrading and accessibility improvement in Bnei Brak, Kfar Chabad and Kiryat Gat railway stations, including building, infrastructure and water systems, earthwork, paving, electrical and communication systems, air conditioning, platforms, elevators, exterior development, generator and metal works.
Project Value: NIS 20,000,000
Detailed multi-disciplinary design for the expansion of FCC plant
Client: OIL Refineries LTD
Planning processes, 3D design of piping systems, three-dimensional modeling, mechanical and equipment design, steam lines, civil engineering, preparation of building permit paperwork, project engineering, preparation of RFI for contractors and project book.
Project Value: NIS 50,000,000
Project management – connecting "Eshkol" water reservoir to "Somech" reservoir
Client: Mekorot Israel National Water Co
Project management: connecting water reservoir "Eshkol" to reservoir "Somech". The project included the laying of an 11 km pipeline and the construction of "Somech" reservoir over an area of 250,000 square meter.
Project Value: NIS 150,000,000
Management and supervising of the upgrading and accessibility improvement in Beer Yaakov Railway station
Client: Israel Railways
Management and supervision of concrete works and construction of a 23 meters length bridge, moving stairs, elevators, escalators, raising existing platforms levels, adding a new dock, generator room and electrical room, electrical and communication systems, development of parking places, roads and landscaping.
Project Value: NIS 14,000,000
Planning, managing and supervision of the upgrading of water supply and sewer infrastructure
Client: Mei Carmel Co
Planning, managing and supervisingthe upgrading of water supply and sewer infrastructure in Ramat Begin and Bat Galim neighborhoods, Haifa City. The work included replacement of water and sewer pipelines including connections to existing structures and rehabilitation of pavements and roads.
Project Value: NIS 10,000,000
Management and coordination design of the upgrading and accessibility improvement of the disabled Israel Railways stations
Client: Israel Railways
Management and coordination of detailed design and RFI for Contractors in train stations Bat Galim (Haifa), Kiryat Motzkin, Carmel Beach, Binyamina, Hadera and Netanya Train Stations including budgets and time schedules preparation for the stations upgrading (bridges, elevators, escalators, electricity and communications infrastructure, construction works, platforms extensions, upgrading passengers halls and systems), infrastructures & water systems.
Project Value: NIS 80,000,000
Project engineering, piping system design and civil engineering for the expansion of a food plant
Client: Unilever
Engineering project and supervisionof the upgrading of oil storage tanks in "Telma" factory. The project included replacement and addition of input lines, Oil dispersion and changing the internal floor of containers, testing the implementation of changes at the processes facility and implementing a new vacuum system.
Project Value: NIS 6,000,000
Construction of "Allenby" road interchange in Haifa
Client: Yefe Nof
Management & supervisionof completion Allenby interchange in Haifa. The work included construction of exit ramp to the junction, connection to 'Hubert Humphrey St. which connects to the Bat Galim neighborhood, completion of a bridge, drop ramps, roads upgrade, development of "Surfers beach", establishment of a new surf club and connection to "Haaliya St. in Bat Galim.
Project Value: NIS 35,000,000
Planning and supervision of natural gas lines in South of Israel
Client: Southern Natural Gas
Detailed design of the natural gas lines from Sderot to Ashkelon including:
• Handling statutory compliances and obtaining permits and approvals from the Gas Authority, the Licensing authority, INGL and others.
• Determining the pipeline route and PRMS stations location.
• Geotechnical report, landscape restoration and risk survey.
• Mapping and measurements.
• Piping design.
Project Value: NIS 25,000,000
Systems and Infrastructure works
Client: Israel Ministry of Defense
Supervision of the laying sewer lines, pumping station and water piping systems for Air Force Base. Supervision of the establishing a water and sewage infrastructure, electricity, drainage and firefighting system for the Navy. Project Value is about NIS 18,000,000
Extending of railways stations' platforms around the country
Client: Israel Railways
Availability, feasibility and design management of the Binyamina – Ashkelon line extension.
Project Value is about NIS 100,000,000
Natural gas lines of "Dorad" new power station in Ashkelon
Client: Lesico Ltd.
Detailed 3D design of the natural gas lines for a new power station in Ashkelon, including pipe support design and stress analysis, design of drainage, decompression lines systems, boilers and auxiliary burner service lines. Working with WOOD GROUP Company (USA), specializing in setting up power stations, gas turbines and natural gas systems.
Project Value: NIS 1,500,000
Water systems' project management
Client: Mekorot (Israel's National Water Company)
Project Management of the laying 36" line from Deborah station to Kfar Yehoshua (including stations' connections) along the 3.5 km, including horizontal drilling and tunneling along the 200 meters of weighted length under rivers and under the National Water Carrier of Israel.
Project Value: NIS 14,000,000
Plastic Factory expansion
Client: NILIT
A continuous nylon dryer's set up multi-disciplinary planning.
The work included the establishment of unloading tankers' platforms and transport system of polymer feed to the dryer, placing chiller, and also establishment of mixing system with tanks, pipe bridges and pneumatic transportation. The project comprised a process design, civil engineering, piping systems and equipment, electrical and control designs.
Project Value: NIS 4,000,000
Construction of roundabout, road, promenade and
bicycle route in Rosh Pina
Client: Jewish National Fund
Managing and supervising of the construction of a roundabout, expansion and upgrading of existing road, parking area and promenade in Rosh Pina, including bicycle route from Rosh Pina to Hazor along Highway 90. The works include: paving, lighting, site development, landscaping and irrigation, electricity, water and drainage systems, retaining walls, signage and etc.
Project Value: NIS 8,000,000
Tank farm
Client: Oil Refineries Ltd.
Detailed design of the pipelines for various types of diesel fuel, from the New Hydrocracker unit to the Oil Refineries tank farm's diesel tanks. Project Value: NIS 6,000,000
Establishment of a new food factory
Client: Talas - Food Industries Ltd.
Management and supervision of the food plant construction in the "Mevoot Gilboa" industrial park .Development works' managing and supervision at the area of approximately 10,000 square meters. Construction works' managing and supervision of about 6,000 square meters on three floors.
Project Value: NIS 8,000,000
Water infrastructure systems
Client: Mekorot (Israel's National Water Company)
Supervision of the water supply systems works including: moving of the 20" water line at Krayot's Jordan Street, adding high flow pumping unit at Shimshit station, laying 30" diameter 3 km long and 32" diameter 200 meters long water piping system that connects Kochav Yair and Javits stations, laying water piping systems and sleeves of 42" and 32" diameters at Krayot bypass road.
Project Value: NIS 6,000,000
EPCM (Engineering, Procurement and Construction Management) Project
Client: Elephant
Management, planning and supervision of the new furniture factory construction in "Shahak" industrial park. The factory covers an area of 10,000 square meters. The work included civil engineering design of roads and access, pipelines and equipment, preparation of building permit, preparation of environmental appendix, electrical systems design, planning, sanitary systems, air conditioning and fire protection designs, infrastructure and water systems and etc.
Project Value: NIS 11,000,000
Passengers' protection at railway stations
Client: Israel Railways
Project planning, management and supervision of the blast-resistant doors installation in the underground passes of 10 existing railway stations. Project Value: NIS 4,000,000
Plant's natural gas pipeline system
Client: Negev Ceramics
Detailed design of a natural gas pipeline for The Negev Ceramics plant comprising:
• the route of underground and upper ground pipes
• stress analysis for pipe lines and bridges
• three-dimensional design
Project Value: NIS 250,000
Water lines systems
Client: Mekorot (Israel's National Water Company)
Supervision of the 11 km long 20" diameter drinking water pipe systems' replace from Alonei Bashan drilling site to Maayanot Peham.
Project Value: NIS 18,000,000
Earthquakes rehabilitation and strengthening of structures design
Client: Mekorot (Israel's National Water Company)
The project included:
• visitors center's escape routes planning in "Eshkoll".
earthquakes strengthening and reinforcement planning for chlorination unit structure.
rehabilitation and strengthening design of Barkat trenches.
Project Value: NIS 1,500,000
Gulf Central's Bridge
Client: Yefe Nof
Management, coordination and supervisionof the pedestrian bridge construction over the rails. The work includes piles establishing works, reinforced concrete works, structural steel works, elevators, drainage under the railway line, finishing work and site development. Project Value: NIS 4,000,000
Detailed design of fire extintion systems
Client: Haifa ORL
Planning and construction of three-dimensional model for piping systems detailed design, pipe support and civil engineering for gates 6 and 7 in the Haifa ORL compound.
Project Value: NIS 3,000,000
Supervising the construction of water reservoir
Client: Mekorot (Israel's National Water Company)
Supervision of the building of a pool for storing drinking water. The works included construction works, electricity, pipe laying, a wireless communication facility, cathodic corrosion protection and site protection.
Project Value: NIS 5,000,000
Multidisciplinary design of chlorination & wastewater plant
Client: Mekorot (Israel's National Water Company)
Detailed design of drilling liquid chlorination system, including planning containers, pumps, instrumentation and control, electricity, buildings, civil engineering, piping systems and approval of permits by the authorities. Detailed design for the laying in of 3 km length and 16" diameter pipe line for the northern "Taanach" area.
Project Value: NIS 5,000,000
Management and supervision sequential extension of Ganey Aviv train station
Client: Israel Railways
Management and supervision of the upgrading of the water supply infrastructure and fire extinguishing systems, electricity, telecommunications and docks extension construction works. The project included also the building of an accessible environment in the passenger rail station "Ganey-Aviv". This work was carried out without disturbing the passengers and the movement of trains with an emphasis on safety.
Project Value: NIS 2,500,000
Building , Piping system & equipment Planning for new Starch Dryer Plant and Soakage Evaporator at GALAM
Client: GALAM LTD
Civil Engineering Planning of new buildings including a transformer room for the starch dryer and soakage evaporator, the building of foundations for equipment systems and piping bridge and the planning of piping systems.
Project Value: NIS 18,000,000
Management, Coordination & Supervision of infrastructure works at Had-1200 site, Hadera
Client: Hadera Economic Economic Corporation LTD
The Project includes underground infrastructure works drainage, sewage, water supply, communications, electricity and roads construction (including the construction of a 4 lanes main Municipal road : Mishmar Hagbul road ), paving of roads and sidewalks, public areas development, gardening, and a 70 dunams park.
Project value: NIS 130,000,000
Supervision of overhaul works at the Haifa ORL-Oil Refineries Ltd plants
Client: Haifa ORL- Oil Refineries LTD
Supervision of multi-disciplinary overhaul and upgrading works performed at the Haifa ORL-Oil Refineries Ltd production plants & facilities.
Project Value: NIS 25,000,000
Renovation and expansion of the Council building and Sport Auditorium in Kibbutz Gvat
Client: Regional Council Emek Yizrael
Management and supervision of renovation and expansion works of the Council building and sport auditorium (basketball) at kibbutz Gvat. The project includes construction works, infrastructure, electrical and plumbing works, finishing works and restoration of architectural elements including parquet floors replacement.
Project Value: NIS 4,500,000
Management and supervision of the construction of surrounding and access roads and ways to the new stadium in Haifa
Client: Yefe Nof
Management and supervision, including management and planning coordination, of the construction works of surrounding roads for the new Haifa Municipal Stadium, including parking lots.
Project Value: NIS 30,000,000
Management & Supervision of the city of Acre Quarters Restoration and road upgrading project
Client: Acre Municipality
1. Planning of Acre Quarters Restoration including overall architecture and construction, electricity, communications, water and sewage infrastructures. The project includes the preparation of technical specifications, bill of quantities and tenders specifications for subcontractors election.
2. Managing and supervising of the rehabilitation and upgrading of residential quarters, including main roads and access roads in the city of Acre.
Project Value: NIS 15,000,000
Natural Gas reception and transmission at Oil Refineries LTD
Client: Oil Refineries LTD
3D design of piping system for reception and transmission of natural gas for GADIV Petrochemical Industries LTD including process layout design, mechanical design and isometric piping planning.
Project Value: NIS 16,000,000
Management and Supervision of platform enlargement and train stations upgrading at the Bnyamina - Ashkelon lines
Client: Israel Railways
Management and Supervision of the upgrading of water, electricity and communication infrastructures, construction and enlargement of train stations platforms including the upgrading of access to built areas at 11 train passenger stations between Bnyamina and Ashkelon train lines. The project works were performed round the clock at a very strict timetable without disturbing the scheduled passenger train traffic, bearing in mind safety issues.

Project Value: NIS 30,000,000
BAMBURY Plant for rubber mixtures manufacturing
Client: TGL SP Industries
Project Description: Erection of a 4-stories steel structure for rubber mixtures preparation, including foundations, process equipment, conveyors, piping system and cooling tower. The project included the design of arrays and detailed design of steel and concrete structures, piping systems, tender terms preparation for sub-constructors election, management and supervision
This was an EPCM (Engineering, Procurement, and Construction Management) project.
Project Value: NIS 10,000,000
Wastewater Treatment Plant
Client: Paz Ashdod Refinery LTD
Management and supervision of the construction of a wastewater treatment plant, including designing a two-floor electrical room, an off-site piping system for the unit, piping bridges, and main electrical channels. The plant covers an area of approximately 4000 m², and is capable of treating 1200000 m³ of wastewater per year.
Project Value: NIS 65,000,000

Infrastructure for a Residential Area
Client: The Society for Netanya Development & Tourism LTD
Project Management and supervision of infrastructure work covering an area of approximately 350000 m² for a residential area planned to house approximately 2000 units in the "Agamim" area of Netanya. The project includes subterranean infrastructure, sewers, water, drainage, electricity, communications, roads and sidewalk paving, and the development of public areas.
Project Value: NIS 45,000,000

Water Desalination Plant in Hadera
Client: I.D.E. Technologies LTD
Designing a model of the piping system, integrating equipment and processes, piping layout, and isometric piping planning in Bentley (3D plan).
Output of the unit: 120 million cubic meters per year.
Construction of Tyrec Ltd. Plant
Building a tire recycling plant in the Shahak Industrial Park (Tyrec). This was an EPCM (Engineering, Procurement, and Construction Management) project. The plant covers more than 14000 m², of which approximately 3000 m² are dedicated to the production plant and office buildings. Civil engineering design, piping and fire protection systems, equipment systems, electricity, air conditioning, and more.
Project Value: NIS 60,000,000

Construction of a Sportek Center
Client: The Society for Netanya Development & Tourism LTD
Project Management and Supervision of the construction of one of Israel's largest tennis and Sportek centers, in Netanya. The center covers 30000 m², and includes 12 tennis courts, basketball courts, volleyball, roller hockey, fitness and weight-lifting devices, office buildings, and a cafeteria.
The project included: earthmoving, infrastructures, area development, land preparation, and construction.
Project Value: NIS 15,000,000

Construction of R&D Building – Taro, Haifa
Client: Taro Pharmaceutical Industries LTD
Project Management and supervision of the construction of a five-story building built to hi-tech standards on a 6000 m², including development, construction, air-conditioning systems, electrical systems, industrial sewage piping and sanitation, chemical laboratories, offices, and production halls including clean-rooms, furniture, and landscape development.
Project Value: NIS 26,000,000
Expansion of Phoenicia America-Israel (Glass) Ltd. Plant
Management and supervision of infrastructure construction, laying asphalt, development and construction of the plant's expansion site to produce concave mirrors with innovative technologies. The project covers approximately 10000 m², including constructing the production facilities and moving the carpentry facilities to their new building of 3000 m².
Project Value: NIS 15,000,000
Construction of Pumping Station in Netanya
Client: The Society for Netanya Development & Tourism LTD
Project Management and Supervision of the construction of a pumping station submerged in the sea at a depth of 11 meters. The project was carried out using the Jet Grout method, which allows for the construction of subterranean buildings without lowering the water level. The pumping station is located in Netanya's Villa Sky – a giant residential project including 6000 housing units in high-rise apartments, and 3000 units intended for use as hotels.
Project Value: NIS 9,000,000
Design of a New Train Station in Ashdod
Client: Israel Railways
The design included: civil engineering, construction, area development and parking areas, electric and communication systems, air conditioning, plumbing, water, and sewage systems, building and other permits – 1000 m² in total.
Project Value: NIS 12,000,000

Expansion of Alliance Plant
Client: Alliance-Hadera
Expansion of the plant included: installing a new Calendar unit and conveyor belt system, industrial systems including the planning and civil engineering of a 3000 m² production hall with an electricity and communication room, planning electric and control systems, piping and conveyor belt systems, ventilation, equipment complexes, safety, and preparation of purchase documents.
This was an EPCM (Engineering, Procurement, and Construction Management) project.
Project Value: NIS 15,000,000
"Check Center", Check Post, PO Box 25162, Haifa 3125101
Tel: 972-4-8215020 Fax: 972-4-8215279
© 2009 B. A. B. Engineering Design & Development Ltd. All rights reserved.
עיצוב ובניית אתרים WEB3D עיצוב ובניית אתרים